VigiChain
VigiChain

Entering the network

scroll
Network statusTestnet active · Mainnet locked

Digital value, protected before the future arrives.

Post-quantum cryptographic security software: a sovereign network that strengthens custody, settlement and identity. Testnet active; mainnet opens when independent validation supports it. Ten layers, each with its own page and its real state on it: three running, two half-built, five written but not yet on the network.

Core first

The core comes first — and stays protected.

V1 is the base layer: mining, proof-of-work validation, blocks, RPC, explorer and post-quantum signatures. A BFT finality gadget is present but advisory and in development — not yet bound into fork-choice, so proof-of-work decides the canonical chain today. It depends on no external token, and the network's gas — the cost of using it — goes to the miners and validators who secure it. VIGI is the native asset — earned by mining, validating and using the network.

  • V1 — Core network
    Active on testnet. Mainnet locked until validation is complete.
  • V2 — Wrapped asset layer
    Built and tested on testnet: protocol-approved wrapped assets that mint only under a custody proof-of-reserve. Activates after independent audit.
  • V3 — Expanded verified assets
    Future: more verified fintech assets, at the same bar.
  • V4 — Global coverage
    Future: hundreds of wrapped assets — only if useful, liquid and auditable.

Security & sovereignty

Proof layers sealed into a post-quantum chain.

Value on VigiChain moves only under post-quantum signatures — the network is built as a function of the post-quantum future. And there is no public token factory: no user-accessible mint path exists, and arbitrary token creation is rejected by the consensus rules of the launched network. Only protocol-approved assets with transparent rules exist here; new asset classes could only ever be enabled by a coordinated protocol upgrade, never by an individual user.

Sealed ledger blocks in sequence

Execution layer

An execution layer that never takes your custody.

Above the base chain runs a post-quantum execution layer — a rollup where balances are native VIGI, backed one-to-one by VIGI locked on the L1. Withdrawals are trustless: a validity re-execution check finalises them instantly, or an optimistic challenge window secures them, and you can always exit to the L1 yourself even if the operator goes silent. A fraudulent batch is provably reverted. None of it is running. The code is finished and its own tests pass, and the live network answers plainly that the rollup is inactive: zero batches, no sequencer, nothing locked in the bridge. It stays that way until independent validation closes.

Vigi Passport

Identity, credentials and licenses.

Vigi Passport anchors identities, credentials, licenses and documents to tamper-resistant proofs — and links your EVM and Bitcoin identities to one post-quantum account.

Wrapped assets with rules

Verified value, never arbitrary tokens.

The wrapped-asset layer is built and tested: protocol-approved assets — relevant stablecoins, BTC, ETH, SOL, and real DeFi, RWA, infrastructure, oracle and payments assets. Each mints only under a custody committee's on-chain proof-of-reserve, so wrapped supply can never exceed the reserve that backs it. Each carries published rules: origin, reserve proof, fee legs, risk tier and mint cap. It stays disabled until the custody bridge — the highest-risk component — passes independent audit.

Vigi Wallet

Your keys. Every chain. One vault.

The native VigiChain wallet: post-quantum self-custody across Bitcoin, Ethereum, every EVM network, Solana and Cronos — each asset shown by its original logo, with SafeSign checking every transaction before you sign.

Vigi Wallet home — one vault across Bitcoin, Ethereum, EVM networks and Solana
Vigi Wallet market — every asset with its own logo and live price

VigiBank

A sovereign bank layer, inside your wallet.

Connect external bank identities by explicit consent and read your whole capital position beside your crypto — read-only, revocable and fully self-custodial. Your funds and keys never leave your control.

VigiBank — bank capital read beside crypto, read-only and revocable

VigiRail

Institutional payments, gasless and post-quantum.

VigiRail is the institutional payment and financial-messaging layer of VigiChain — ISO 20022-compatible, post-quantum, and gasless for the sender. It is a protocol subsystem, not a separate chain. On the testnet it can be joined and used today: an institution is admitted under a quorum of named authorities, signs with a real post-quantum key, and carries a payment from initiation to settlement. The chain can also carry and commit the rail, and no network has switched that on yet — so the rail says of itself that it is not committed by consensus, and its signature backend is pinned but not independently approved for production. Mainnet stays locked.

Ecosystem

One sovereign stack, five instruments.

Each layer is honest about its state — nothing future is sold as live.

The whole surface

Everything VigiChain already includes.

One sovereign post-quantum network, and the pieces that run on it. What is active says so; what is built but still locked says that too.

  • Post-quantum chain
    Testnet active; mainnet locked until validation closes.
  • VigiScan explorer
    Blocks, transactions, validators and assets, in the open.
  • Vigi Wallet
    Self-custody across Bitcoin, Ethereum, EVM networks and Solana.
  • VigiBank
    Your bank capital read beside your crypto. Read-only and revocable.
  • Wrapped assets with rules
    Protocol-approved only. There is no public token factory.
  • VigiRail
    An institutional payment rail. Joinable and usable on the testnet today; not yet committed by consensus.
VigiScan reading the VigiChain testnet: latest block, block time, total transactions, hashrate, circulating supply, validators, mempool and UTXOs, with the latest blocks and the most recent transactions

VigiScan reading the public gateway at vigichain.org/rpc — a real capture, not a mock-up. The figures are the testnet as it stood the moment the shot was taken.

Testnet → Mainnet

Live on testnet. Locked until proven.

The network runs today as a public testnet: anyone can join it from their own machine with one command, and mining and post-quantum propagation are live. Be honest about its shape — the chain is currently produced by a single anchor node, and the network publishes that figure itself rather than letting a validator count imply otherwise. It improves the moment a second producer joins. The public RPC gateway and the VigiScan explorer are online now. Mainnet stays locked until independent security validation closes — no presale, no promises of return. VIGI is earned only by mining, validating and using the network.